Project record
Sunteck Lifespace Private Limited
RERA P51700055703 · construction began Feb 2024
Public-record score
Some risk
Scores the 5 checks the register answers. The other 4 it leaves open.
5 / 9 answered
The last 3 are not withheld — they are genuinely absent from the public record. Each needs a document read against your flat, or filings worked out over several quarters. Delivery outlook: 68/100, from 58 of 85 assessable points.
Which flat are you looking at?
Everything above is about the project. It doesn't tell you whether your floor is legally cleared to be built yet — and that answer changes floor by floor.
This project registers one building: Building 3.
14 homes across 2 registered types. Bar length is how many homes of that type exist; the solid part is how many are booked.
0 of 14 booked · 0% overall
Carpet area converted from the square metres the promoter registered (1 sq.m ≈ 10.76 sq.ft). Booking figures are reported quarterly, not live availability. Confirm your flat's carpet area against your Agreement for Sale.
This is the count on the registration record. The promoter also files a quarterly “sold and booked inventory” disclosure, which the detailed report reads — the two are separate filings and can differ.
Geo-tagged location as declared to MahaRERA. Verify the exact plot on site before you buy.
1 building · 1 wing · 357 units declared
The builder owns the land · The Mira-Bhayandar Municipal Corporation (MBMC) · valid to 31 Dec 2030
We run them all — future-phase amenities, agreement-vs-RERA-model deviations, CC floor coverage, sanctioned-vs-brochure layout, active litigation and the 70% escrow — in the Detailed Report, with the exact finding for this project.
On-time delivery
On track68/100On the register's own numbers, the date is reachable.
Possession is committed for 30 April 2031, about 4 yrs 6 mos away, with 59% still to build — roughly 1.1% a month from here. In the 2 yrs 9 mos since construction began, 41% has been built — an average of about 1.2% a month, which early work will not hold to on its own.
Committed for
30 April 2031
1 extension taken
Built so far
41%
in 2 yrs 9 mos
Pace needed now
~1.1%/mo
close to the pace so far
Built vs expected by now
9 points ahead
Saathi Plus · with you beyond booking
One membership covers every tool, for every project you're considering — and every report, with no separate purchase.
From shortlist to possession
Every tool, for every project you're considering — rather than one report at a time.
AI findings and drafts are there to help you prepare. An advocate should review anything you act on legally.
₹2,999/ year, or ₹399/month
See plans & start a trial →Billing, trial terms and cancellation are on the pricing page. Membership includes every project report — no separate purchase.
Quarterly filings look current — the last was ~3 month(s) ago (15 in the past year).
Which mandated documents are missing, per-wing CC coverage, SLA breaches and your remedies.
Legal title report, declarations and search documents the promoter filed with MahaRERA.
Fetched live from MahaRERA: registration status, possession dates, units, promoter, construction progress and complaints. Formal orders aren't pulled yet. The Safety Score is an interpretive aid from factual public signals — not legal advice or a judgment on any promoter. Always verify on the official portal. See how we score.
Answered from the public MahaRERA record. Always verify on the official portal before you pay.
“Expected” is where a project this far into its committed timeline typically sits — a typical curve, not a rule. Both figures come from the promoter's own filings, not a site inspection.
So when will it actually be handed over?
This page says whether the promoter's date is reachable. The detailed report projects a handover date from the build pace, with the working shown — and Saathi Plus re-forecasts it every quarter as new filings land.
See the projected date3 factors scored, 1 left out for want of data — 58 of 85 assessable points, scaled to 100.
Possession as filed: ~4.5 yrs to go. Every input comes from the promoter's own MahaRERA filings and updates as they file. A registered date is a declaration, not a guarantee.
Already had your free week? One project, one payment — nothing recurring. Saathi Plus is the separate, ongoing service.
Saathi Plus
₹399/ month, or ₹2,999 a year
Billing, trial terms and cancellation are on the pricing page.