Project record
CHADHA DEVELOPERS AND PROMOTERS
RERA P51700028831 · construction began Mar 2021
Public-record score
Some risk
Scores the 5 checks the register answers. The other 4 it leaves open.
5 / 9 answered
The last 3 are not withheld — they are genuinely absent from the public record. Each needs a document read against your flat, or filings worked out over several quarters. Delivery outlook: 6/100, from 5 of 85 assessable points.
Which flat are you looking at?
Everything above is about the project. It doesn't tell you whether your floor is legally cleared to be built yet — and that answer changes floor by floor.
Homes in this project
MahaRERA holds no registered apartment types or carpet areas for this project — the breakdown a tower files. Plotted and bungalow schemes are usually registered this way, because each home is a plot rather than a configuration. That is an absence in the filing, not a gap in what we read.
Geo-tagged location as declared to MahaRERA. Verify the exact plot on site before you buy.
133 buildings · 133 wings · 8228 units declared
Authority land — held on lease / allotment · Maharashtra Housing and Area Development Authority (MHADA) · valid to 07 Sept 2027
We run them all — future-phase amenities, agreement-vs-RERA-model deviations, CC floor coverage, sanctioned-vs-brochure layout, active litigation and the 70% escrow — in the Detailed Report, with the exact finding for this project.
On-time delivery
At risk6/100The committed date looks out of reach.
Possession is committed for 7 September 2027, about 10 mos away, with 73% still to build. That needs roughly 7.2% a month from here — faster than the ~3% a month a project sustains when it is going well. In the 5 yrs 8 mos since construction began, 27% has been built — an average of about 0.4% a month, which early work will not hold to on its own.
Committed for
7 September 2027
1 extension taken
Built so far
27%
in 5 yrs 8 mos
Pace needed now
~7.2%/mo
~18× the pace so far
Built vs expected by now
68 points behind
Saathi Plus · with you beyond booking
One membership covers every tool, for every project you're considering — and every report, with no separate purchase.
From shortlist to possession
Every tool, for every project you're considering — rather than one report at a time.
AI findings and drafts are there to help you prepare. An advocate should review anything you act on legally.
₹2,999/ year, or ₹399/month
See plans & start a trial →Billing, trial terms and cancellation are on the pricing page. Membership includes every project report — no separate purchase.
The last filing was ~6 months ago — behind the expected quarterly cadence (76 filing(s) in the past year).
0 of 1 past project(s) completed, as declared · 1 in progress
Which mandated documents are missing, per-wing CC coverage, SLA breaches and your remedies.
Legal title report, declarations and search documents the promoter filed with MahaRERA.
Fetched live from MahaRERA: registration status, possession dates, units, promoter, construction progress and complaints. Formal orders aren't pulled yet. The Safety Score is an interpretive aid from factual public signals — not legal advice or a judgment on any promoter. Always verify on the official portal. See how we score.
Answered from the public MahaRERA record. Always verify on the official portal before you pay.
“Expected” is where a project this far into its committed timeline typically sits — a typical curve, not a rule. Both figures come from the promoter's own filings, not a site inspection.
So when will it actually be handed over?
This page says whether the promoter's date is reachable. The detailed report projects a handover date from the build pace, with the working shown — and Saathi Plus re-forecasts it every quarter as new filings land.
See the projected date3 factors scored, 1 left out for want of data — 5 of 85 assessable points, scaled to 100.
Possession as filed: ~10 mo to go. Every input comes from the promoter's own MahaRERA filings and updates as they file. A registered date is a declaration, not a guarantee.
Already had your free week? One project, one payment — nothing recurring. Saathi Plus is the separate, ongoing service.
Saathi Plus
₹399/ month, or ₹2,999 a year
Billing, trial terms and cancellation are on the pricing page.